VU Midterm Past Papers
29 solved midterm past paper MCQs for CS605 (Software Engineering – II) at Virtual University, each with the correct answer marked. Use them to learn the VU question style and test your recall. An independent study tool — not affiliated with VU.
Prefer a summary first? Read the CS605 midterm handout.
Q1. Defects per function points is a
Q2. Which statement is correct?
Q3. ........technique was initially developed for manufacturing processes in the 1920's by Walter Shewart.
Q4. Hardware, Software tools, People and Reusable software components are considered as ................ for an Organization.
Q5. In . there is both vertical and horizontal communication.
Q6. Requirements are sometimes fill with defects, normally known as requirements.
Q7. A process model defines a task set which comprises of SE work tasks, milestones and
Q8. activity is performed throughout software production
Q9. The major activities related to software construction are :
Q10. Estimation of the ________ is a prerequisite for all sorts of estimates, including. resources, time, and budget.
Q11. Which of the following is not a software measure?
Q12. Capability Maturity Model (CMM) has levels.
Q13. is the ability to encourage people to create and feel creative.
Q14. model is a haphazard type of software development activity.
Q15. A —-------———-entity is the one which have any —-----—— in the problem domain without some other entity.
Q16. The conceptual interface between the ‘internal application and the ‘external’ user world is known as-—----—--
Q17. Every project has a defined number of staff members. As time allocation occurs. the project manager must ensure that no more than the allocated number of --—--—--— have been scheduled at any given time
Q18. SEI stands for
Q19. ‘We need to employ some statistical techniques and plot the results -—----——---. These are known as statistical control techniques.
Q20. Software Project Planning is an activity carried out by the. .
Q21. is an Object Oriented model.
Q22. <r files are the logical files that the customer understands and must be maintained by the system.
Q23. In measuring Software Process Quality by using control charts, if the gap between the defects reported and defects fixed is increasing, then it means
Q24. ________ is fundamental for providing mechanisms for objective evaluation of any process or activity.
Q25. ________ lifecycle models appreciate the need for iteration within and between phases.
Q26. ________ dimension of Spiral model represents the cumulative cost to date
Q27. MOI model of leadership stands for
Q28. The important feature of extreme programming is the concept of ________.
Q29. If the gap between the defects reported and defects fixed is decreasing, then it means that the product is in ________ condition.